The purpose of this study is to demonstrate the pharmacodynamic equivalence of triptorelin pamoate (Pamorelin® LA 11.25 mg), applied either IM or SC, in terms of the area under the curve \[AUC1-85day\] for serum testosterone in patients with advanced prostate cancer.
Study Type
INTERVENTIONAL
Allocation
RANDOMIZED
Purpose
TREATMENT
Masking
NONE
Enrollment
109
Pamorelin® LA 11.25 mg administered as standard IM injection (= reference group) at Day 1 and Day 85. Triptorelin Pamoate (Pamorelin® LA 11.25 mg) applied subcutaneously (s.c.) at Day 1 and Day 85.
Kreiskrankenhaus, Abteilung Urologie
Bad Bergzaben, Germany
Praxis für Urologie
Bad Ems, Germany
Area Under the Curve of Testosterone Serum Concentration Between D1 and D85 (AUC1-85d).
Area under the curve (AUC) calculated from serum testosterone concentration taken at intervals between the first administration (Day 1) of the study drug and Day 85 after dosing. From the curve describing serum testosterone concentration levels (ng/mL) over time, the AUC was calculated using numerical integration methods. This value was log-transformed to more closely meet the assumption of the statistical method.
Time frame: 1, 3, 5, 8, 15, 22, 29, 57, 85 days post-dose
Area Under the Curve of Testosterone Serum Concentration Between D1 and D169 (AUC1-169d)
Area under the curve calculated from serum testosterone concentration taken at intervals between the first administration (Day 1) of the study drug and Day 169 after dosing. From the curve describing serum testosterone concentration levels (ng/mL) over time, the AUC was calculated using numerical integration methods. This value was log-transformed to more closely meet the assumption of the statistical method.
Time frame: 1, 3, 5, 8, 15, 22, 29, 57, 85, 87, 113, 141 and 169 days post-dose
Area Under the Curve of Testosterone Serum Concentration Between D85 and D169 (AUC85-169d)
Area under the curve calculated from serum testosterone concentration taken at intervals between Day 85 and Day 169 after dosing. From the curve describing serum testosterone concentration levels (ng/mL) over time, the AUC was calculated using numerical integration methods. This value was log-transformed to more closely meet the assumption of the statistical method.
Time frame: 85, 87, 113, 141 and 169 days post-dose
Maximum Concentration of Serum Testosterone [Cmax] - Raw Data
Cmax was assessed as the maximum testosterone serum concentration between the first administration of the study drug and Day 169.
Time frame: 1, 3, 5, 8, 15, 22, 29, 57, 85, 87, 113, 141 and 169 days post-dose
This platform is for informational purposes only and does not constitute medical advice. Always consult a qualified healthcare professional.
Praxis für Urologie
Bamberg, Germany
Praxis für Urologie
Berlin, Germany
Praxis für Urologie
Braunschweig, Germany
Praxis für Urologie
Cham, Germany
Praxis für Urologie
Chemnitz, Germany
Praxis für Urologie
Dessau, Germany
Praxis für Urologie
Eisleben Lutherstadt, Germany
Loretto Krankenhaus, Abteilung Urologie
Freiburg im Breisgau, Germany
...and 12 more locations
Maximum Concentration of Serum Testosterone [Cmax] - Log-transformed Data
Cmax was assessed as the maximum testosterone serum concentration between the first administration of the study drug and Day 169.
Time frame: 1, 3, 5, 8, 15, 22, 29, 57, 85, 87, 113, 141 and 169 days post-dose
Time to Castration [Tcast] - Testosterone Level Less Than or Equal to 0.5 ng/mL
tcast is the number of days between day of first administration of the study drug and the day the testosterone level reaches the limit of castration defined as testosterone level less than or equal to 0.5 ng/mL for the first time. Analysis of tcast was based on the Kaplan-Meier estimator.
Time frame: 12 weeks
Time to Castration [Tcast] - Testosterone Level Less Than 0.5 ng/mL
tcast is the number of days between day of first administration of the study drug and the day the testosterone level reaches the limit of castration defined as testosterone level less than 0.5 ng/mL for the first time. Analysis of tcast was based on the Kaplan-Meier estimator.
Time frame: 12 weeks