Parkinson's disease (PD) is a chronic, progressive disease that causes motor and non-motor symptoms due to dopaminergic neuron loss. Today, the treatment of PD in addition to optimal medical and surgical treatments, physiotherapy and rehabilitation approaches have an important place in the treatment. Recently, it has been stated that intensive rehabilitation interventions in the field of physiotherapy and rehabilitation can be more effective than traditional rehabilitation approaches. Lee Silverman VoiceTreatment- BIG (LSVT-BIG) is a high-intensity exercise model aimed at improving bradykinesia and hypokinesia in PD. There are many studies showing improvements in balance, walking, motor performance, reaching ability, postural control, quality of life and cognitive status after LSVT-BIG training in PD. However, it is seen that there is no study investigating the effect of LSVT-BIG training directly by applying it as a home program. For this reason, there is a need for studies investigating whether this intensive treatment method can be an alternative to the clinical environment by applying it as a home program.
This study is planned as a randomized control trial. Patients will be randomly divided into two groups a clinical group and a home group. The clinical group will be received LSVT-BIG training four times a week for four weeks in the clinic. The home group will be received LSVT-BIG training two times a week for four weeks at the home and two times a week for four weeks at the clinical. All assessments will be done before and after the 4-week intervention program or waiting period. The demographic characteristics of the participants initially will be taken. The outcome measures are balance and gait assessments.
Study Type
INTERVENTIONAL
Allocation
RANDOMIZED
Purpose
TREATMENT
Masking
DOUBLE
Enrollment
14
Both groups will receive exercise-based training
Gazi University, Faculty of Health Sciences, Department of Physiotherapy and Rehabilitation
Ankara, Turkey (Türkiye)
Static Balance- Baseline
Assessment will be made with the Biodex Balance System
Time frame: Assessment will be conducted before the intervention.
Static Balance- Post intervention
Assessment will be made with the Biodex Balance System
Time frame: Assessment will be conducted immediately after the intervention.
Gait speed- Baseline
Assessment will be made with the BTS G-WALK, (BTS SpA, Via della Croce Rossa, 11 Padova, Italy;SN: 0213- 0378) during gait
Time frame: Assessment will be conducted before the intervention.
Gait speed- Post intervention
Assessment will be made with the BTS G-WALK, (BTS SpA, Via della Croce Rossa, 11 Padova, Italy;SN: 0213- 0378) during gait
Time frame: Assessment will be conducted immediately after the intervention.
Gait cadence- Baseline
Assessment will be made with the BTS G-WALK, (BTS SpA, Via della Croce Rossa, 11 Padova, Italy;SN: 0213- 0378) during gait
Time frame: Assessment will be conducted before the intervention.
Gait cadence- Post intervention
Assessment will be made with the BTS G-WALK, (BTS SpA, Via della Croce Rossa, 11 Padova, Italy;SN: 0213- 0378) during gait
Time frame: Assessment will be conducted immediately after the intervention.
This platform is for informational purposes only and does not constitute medical advice. Always consult a qualified healthcare professional.